Bon jour~

I bet you're all wondering what's this project about. As stated in the description at the
side panel of this blog, it's basically creating flowers in any form of shapes and sizes using
paper (and any colour to that matter). As an end product, the paper flowers contributed by
you (yes, YOU, the little people in the audience) would be included in the major artwork.


The purpose of this project is to show your own creativity and individuality (how you
interpret an object from reality into an artwork of your own).


So, if you're interested, please send your paper flowers through mail (contact me for the
postal address) or you could just email me the picture. All participants would be credited;
please include your name as well.

P/s: There's no limit to how many paper flowers you could contribute, so get your scissors
and glue ready and let's bloom some flowers shall we?

** Please Recycle all the unused papers.

Deadline for submission :

UK - 30th January 2010 15th February 2010
All over the world - 15th January 2010 (due to postal delivery) 30th January 2010

How did you AWESOME people heard about this project?

Showing posts with label event. Show all posts
Showing posts with label event. Show all posts

23 February 2010

Event Compilation Video

A short documentary of the events I've held for this project.


21 February 2010

Paper Blooms Event 15.02.10

Not a bad turn out :D I was really-really happy to at least be receiving around 30+ paper flowers. It wasn't a bad idea to print a template for people as well. Bonus for that anyway. Here are the pictures from the event :


Paper Blooms Main Event pictures

(Somehow, I can't seem to upload it in this website at the moment. So, facebook will do for the time being. I'll try again soon.)

Thank you for those who participated :

Hazwan Ruslan, Christos Drougkas, Justin Hunter, Janejira Chenarak, Sophie Meddocks, Kota Minato, Tomoya Nishikawa, Siti Khadizah Roslan, Mairaj M. Soomro, Sakiinah Jair, Josri Hj Julay, Aimi Rosli, Maarya Adnan, Rashpal Matharu, Muhammad Ibrahim, Radhakrishnan, Sumia Ishaq, Asghar Sayeed, Rahmah Emran, Humaira Bashir, Uzma Rani Arif, Paryaneh Rostami, Sarah Yasin, Snazia Younis, Faiza Rafique, Mutiba Khan and Vbaid Ruzzon.

Apologies if i have wrongly typed your names.

Thank you to Eff, MJ, Qawi, Aziz and Azri for taking shifts to help me out. Thank you to Rares and Patrick as well.

P/s: Apologies for the late post.

03 February 2010

Paper Blooms Main Event


You are cordially invited to the Paper Blooms Event which will take place at the University of Bradford, Atrium on the 15th February 2010 from 10.00am to 4.30pm.





05 December 2009

Flowers from BruBrad society

As promised, the beautiful flowers done during the first Paper Blooms Project Event.













Please feel free to tag your flowers in the FaceBook Group : Paper Blooms Project

03 December 2009

1st Project Event






Today would be the first trial event for Paper Blooms Project held exclusively for Brunei
Bradford Student Society.

Time : 7 pm
Location : Richmond Building, N3


Hope it'll be a great turn out! See you all there~